Interactive Demo

See how Ecliptic predicts grid bottlenecks. Adjust parameters and watch the aurora visualization reveal tightrope moments.

75 MW
5%/year
20 years
⚠ Tightrope Moment: 2028

⚠ Predicted Bottlenecks

  • 2028 - Capacity exceeds grid by 12 MW
  • 2032 - Secondary bottleneck at 28 MW over
  • 2037 - Critical constraint: 45 MW over capacity

🌿 Recommended Solutions

  • Battery Storage: Add 15 MWh storage to shift 8 MW peak
  • Interconnect Timing: Delay phase 2 by 18 months to align with grid upgrade
  • Load Optimization: Implement predictive curtailment during peak hours